Building Performance Assurance Plan
Planning Phase
- Develop the Design Intent to set the Requirements of Expected Building Performance.
- Develop the Design Criteria for Measuring Building Performance at Acceptance
Design Phase
- Explain the Design Intent and Design Criteria to the Design and Construction Team, for incorporation into their Design and Contract Documents.
- Provide Peer Review of the Project Design for Errors, Omissions, and Adherence to Performance Requirements.
Construction Phase
- Explain to the Construction Team the Requirements of the Building Performance Plan (Design Intent, Criteria).
- Inspect the Work for Adherence to the Performance Plan.
Start-Up / Acceptance Phase
- Provide Independent Inspection, Verification, and Validation of Building Performance.
- Implementation of the BOMR Program (Building Operations, Maintenance Requirements).
- Recommendations for Final Acceptance.
Ownership Transfer Phase
- Condominium Association Review of the BOMR Program, Verification of Building Performance.
- BOMR Plans for Individual Condominiums
BOMR Plans
A simplified, streamlined, easy-to-use manual: How to Operate your Building and its Systems Effectively and Efficiently.
The BOMR Plan Includes:
- An Inventory of All Operating Equipment
- Equipment Identification System
- Photographic One-Line Flow Diagrams of Major Systems
- Operating Procedures for Acceptable IAQ
- Sequence of Operations
- Trouble Response Plan
- Prevention Maintenance Plan
- Operator Training